Execute Comprehensive Electrical activities for IRIS DATA CENTRE 4 & 6
The project entails the establishment of four data centres situated within the Khalifa Industrial Zone Abu Dhabi(KIZAD).
This initiative encompasses the construction of an innovative, modernized prefabricated modular data center in Abu Dhabi, characterized by its Uptime Tier III TCDD and TCCF certifications. The data center’s dimensions encompass 600 IT racks, each with a power capacity of 20 KW, resulting in a cumulative capacity of 12,000 KW. Notably, the second phase of the project is composed of 6+2 sets of 380 TR Air Cooled Chillers, alongside Thermal Storage, facilitating an IT load of 300 racks, each also equipped with a 20kW power capacity (totaling 6,000 KW). The power infrastructure includes 8 containerized generators, each with a capacity of 2,200 KVA, in addition to 16 units of 1,200 KVA UPS, coupled with 12V lead acid batteries.
A100 Iris Data Centre – Khalifa Industrial Zone Abu Dhabi
CLIENT
PIVOT
CONSULTANT
SUDLOWS & DCPRO
MEP CONTRACTOR
LAITH ELECTROMECHANICAL
FLASH ROLE
Execute Comprehensive Electrical Activities for Iris Data Centre 6.
The project entails the establishment of four data centers situated within the Khalifa Industrial Zone Abu Dhabi (KIZAD).
This initiative encompasses the construction of an innovative, modernized prefabricated modular data center in Abu Dhabi, characterized by its Uptime Tier III TCDD and TCCF certifications. The data center’s dimensions encompass 600 IT racks, each with a power capacity of 20 KW, resulting in a cumulative capacity of 12,000 KW. Notably, the second phase of the project is composed of 6+2 sets of 380 TR Air Cooled Chillers, alongside Thermal Storage, facilitating an IT load of 300 racks, each also equipped with a 20kW power capacity (totaling 6,000 KW). The power infrastructure includes 8 containerized generators, each with a capacity of 2,200 KVA, in addition to 16 units of 1,200 KVA UPS, coupled with 12V lead acid batteries.
Service Block Oncology Building –
Sheikh Shakhbout Medical City
CLIENT
SEHA HEALTH CARE SERVICE CO.
CONSULTANT
ALLEN + SHARIFF & MORGAN CONSULTING ENGINEERS
MEP CONTRACTOR
lash Engineering and Contracting LLC
FLASH ROLE
FLASH ROLE: Execute Comprehensive MEP (Mechanical, Electrical, Plumbing) Activities for the Service Block within the Oncology Building.
The project encompasses the establishment of four Service Blocks dedicated to Oncology Radiation Therapy, situated in Sheikh Shakhbout Medical City, Abu Dhabi.
This initiative entails the construction of Service Blocks specifically designated for Oncology Radiation Therapy in Abu Dhabi. The infrastructure includes two 1500KVA transformers, two 1250KVA generators, and a pair of chillers.
Abu Dhabi Company For Onshore Oil Operations Ltd (ADCO)
CLIENT
DAS INTERNATIONAL GROUP
Description: The project was effectively concluded, encompassing cable laying, cable jointing, and cable termination activities at the Jebel Dhana Terminal. These tasks specifically involved 3.3 KV XLPE and 415V power cables, with a combined approximate length of 8000 meters.
ADNOC Head Quarters (Passade Light Installation)
Main Contractor:
JHANGO
Sub Contractor
Tectronics LLC
Description: The project achieved successful completion through the installation of trunking, conduits, and lighting fixtures within the catwalk at the ADNOC Headquarters.
CMW-14000-F020 PROJECT
Client
Command of Military Works (CMW)
Main Contractor
ATECO
Description: Project was successfully completed with the scope of work of Installation of ATS Panel, Cable laying and Termination activities of 44 Stations in all over UAE.
Dubai Police Headquarters Data Centre
Client:
Dubai Police
Sub Contractor
Tectronics LLC
Description: The successful completion of the project involved installing and commissioning LV Panels, conducting termination activities, and implementing Basket Trays and Small Power Works in the data center at Dubai Police Headquarters.
CMW-14000-F020 PROJECT
Client
Command of Military Works (CMW)
Main Contractor
Frontier Works Organization (FWO)
Description: The project was accomplished successfully, encompassing comprehensive electrical works such as lighting, power, ELV, and other related components.
Description: The project was successfully finalized, involving works such as the installation of two 1500 KVA transformers, one 1000 KVA transformer, LV panel work, termination activities, lighting installation, and small power tasks, all approved by DEWA.
Al Khazna Data Centre
Main Contractor:
M + W Group
MEP Sub Contractor:
Laith Electromechanical
Description: The successful completion of the project included the installation and commissioning of lighting, small power, and ELV systems at Al Khazna Data Center in Masdar City.
Pumping Station
Client:
Abu Dhabi Sustainable Water Solutions Company (ADSSC)
Main Contractor:
Abu Dhabi Maintenance & Construction Company LLC (ADMAC)
Description: The project was effectively concluded, encompassing works such as the installation and commissioning of LV panels, termination activities, cable trays and ladders, as well as lighting and small power installations, all approved by ADDC, in pumping stations.
Charcoal Factory Al Wathba
Consultant
EOM
Main Contractor:
New Horizon
Description: The successful completion of the project involved tasks such as installing a 1500 KVA transformer, LV panels, cable trays and ladders, termination activities, as well as lighting and small power systems for the Charcoal Factory in Al Wathba.
Martyrs Square & Monument – Umm Al Quawain
Client:
Umm Al Quawain
Main Contractor:
Professional Landscaping Company
Description: The project was successfully accomplished, involving the installation of various types of landscape light fittings in the Monument and along the pathways of the Martyrs Monument in Umm Al Quwain.